800tph iron ore upgrading project in China

 

The evaluation from customer: We have higher requirements for the final product: grade ≥62%, raw material size≤150mm, product size 200mesh. After their site investigations, the engineers of LIMING Heavy Industry have recommended us the HPT Hydraulic Cone Crusher, ball mill, and magnetic separator as the main equipment, supplemented with Jaw Crusher.

The configuration of 800tph iron ore upgrading project in China

Place of use: China             Raw material: Imported iron ore
Product size: 200 mesh       Work time: 24h(2 shifts)
Ore density: 3.6t/m³             Capacity: 800t/h
Final grade: 62%